Structural steel fabrication · Since 1987
Heavy steel, fabricated to the millimetre.
Tempa cuts, welds, machines and coats structural steel for power, port and infrastructure projects across Indonesia, from one 14-hectare yard in Cilegon.
Fabricated in 2026 so far
16,482t
of 21,600 t yearly capacity76%
- Capacity1,800 t / month
- Longest piece42 m
- Cranes2 × 50 t
- Plate up to100 mm
PowerPortsOil & gasMiningBuildingsBridgesWater
The yard
One yard, three halls, every step under our own roof.
No subcontracted welding, no outside paint shop. Drawings, steel and people stay in one place, so the schedule we promise is the one we control.
- 14hectares in Cilegon
- 1,800tonnes a month
- 420people, 160 certified welders
- 38years in steel

- Length
- 180 m
- Cranes
- 2 × 50 t, 4 × 10 t
- Largest piece
- 42 m / 60 t
- Welding
- SAW, FCAW, GMAW
- Cutting
- CNC plasma, beam line
- Output
- 1,200 t / month
- Milling
- 5-axis, 6 m bed
- Turning
- CNC, Ø 1,200 mm
- Boring
- Horizontal, 4 m stroke
- Tolerance
- ± 0.02 mm
- Inspection
- CMM, 3 m table
- Shifts
- 2 × 8 h
- Blast room
- 30 × 8 × 7 m
- Surface
- Sa 2½, 50–75 µm
- Paint shop
- Climate-controlled
- Systems
- ISO 12944, up to C5
- Film check
- Every piece
- Output
- 9,000 m² / week
From drawing to dispatch
Six steps, one yard.
01 / 06
Engineering
Our engineers turn your design into shop drawings and cutting plans, and send every connection back to you for approval.
01 · EngineeringOur engineers turn your design into shop drawings and cutting plans, and send every connection back to you for approval.
02 · CuttingCNC plasma and laser lines cut plate up to 100 mm thick; a beam line drills and saws sections in one pass.
03 · WeldingCertified welders on submerged-arc and flux-cored lines. Every procedure qualified, every welder traceable to the joint.
04 · MachiningFlanges, bearing seats and shafts are finished in Hall B, so parts arrive on site ready to bolt.
05 · CoatingBlasted to Sa 2½ and coated in a climate-controlled shop, with film thickness measured on every piece.
06 · InspectionDimensional checks, ultrasonic and magnetic-particle testing, then a data book that travels with the steel.
Recent projects
Steel that is already standing.
8 projects · 17,880 t
Lead-time estimator
A first lead time in twenty seconds.

Quality & safety
1,214days without a lost-time injury
Every shift starts with a ten-minute briefing at the gate. Every weld, coat and bolt hole is recorded against the piece mark, so you can trace any part back to the welder and the steel heat.
- ISO 9001:2015Quality management
- ISO 3834-2Comprehensive welding quality
- ISO 45001Occupational health & safety
- AWS D1.1Structural welding code, steel
- SNI 1729Indonesian structural steel standard
Questions from buyers
Before you send drawings.
Up to 42 m long and 60 t by road from our yard, longer by barge from the jetty five kilometres away. Our logistics team plans the route and permits.
Yes, with our own erection crews for projects in Java and Sumatra, and with long-term partners elsewhere. Supply-only is fine too.
Send IFC, Tekla or DWG. We return shop drawings for approval within two to three weeks, with every connection marked.
S275 and S355 plate and sections, ASTM A36 and A572, and 304 and 316L stainless. Other grades are bought against the order, with mill certificates.
Every plate and section keeps its heat number through cutting. The final data book links each piece mark to its certificate, welds and coating records.
From about five tonnes, or a single machined part if it needs Hall B. Below that, we will usually recommend a local workshop we trust.
Send us your drawings.
Estimating
[email protected]
Yard and sales
+62 254 000 1987
Visit
Kawasan Industri Tempa, Cilegon, Banten

